公路工程施工机群实时动态优化配置研究

Research on Real-time and Dynamic Optimal Configuration of Highway Construction Machinery Group
原文传递
导出
摘要 本文分析了公路工程机械化施工机群优化配置问题,在兼顾机群成本和工程质量的前提下,利用折算费用法构建机群优化配置模型,并对最优结果进行评价,以期同时实现机械成本最优化、工期最优化和质量最优化。 This paper analyzes the problem of optimal configuration of highway construction machinery group.In the premise of considering cost of machinery group and the quality of engineering,it utilizes corrected-cost method to structure the optimization configuration model of construction machines.And by means of evaluating the optimization consequence,we are looking forward to realizing concurrently the optimization of the cost of machinery group,construction period and construction quality.
出处 《建筑经济》 2009年第S2期184-186,共3页 Construction Economy
关键词 施工机群配置 折算费用法 优化模型 评价 construction machines configuration corrected-cost method optimization model evaluation
  • 相关文献

参考文献3

二级参考文献6

  • 1McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 2Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 3Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 4Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
  • 5Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
  • 6唐殿峰,秦桂娟.工程项目质量工期费用控制模拟系统[J].沈阳建筑工程学院学报,1998,14(2):158-161. 被引量:16

共引文献171

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部