摘要
园林工程是一座文明的现代化城市不可缺少的基础性设施,而园林工程设计的进度快慢是提高一个园林企业运行效率和经济效益的有效保障。所以,我们必须推行有效的管理模型,优化园林工程设计进度,促进园林绿化企业的长远发展。
The garden project is a civilized and indispensable basic facility in modern city, and the progress speed of the landscape engineering design is an effective guarantee of the operation efficiency and economic benefit of garden enterprise. Therefore, people must implement an effective management model, optimize the design schedule of garden project, and promote the long-term development of enterprises landscaping.
出处
《城市建筑》
2013年第16期171-171,共1页
Urbanism and Architecture
关键词
园林设计
进度优化
模型
garden design
schedule optimization
model