摘要 介绍了中国石油化工股份有限公司荆门分公司65 kt/a硫化氢制酸装置气体冷却塔存在问题及技术改造情况。原气体冷却塔采用碳钢内衬铅板和耐酸砖结构,气体进口管采用钢对钢连接,生产中出现稀硫酸腐蚀泄漏问题。技术改造采用玻璃钢塔取代碳钢塔,气体进口管采用玻璃钢内部搪铅和衬耐酸砖结构,并设置膨胀节。改造后气体冷却塔运行正常,降温效果显著,腐蚀泄露问题得到彻底解决。 The problems with gas cooling tower and related technical transformation in SINOPEC Jingmen Company’s 65 kt / a hydrogen sulphide-burning sulphuric acid plant are described.The original gas cooling tower consisted of carbon steel shell lined with lead plate and acid-resistant brick.The gas inlet tube was connected in the form of steel to steel and encountered with corrosion and leakage in operation.A technical transformation was conducted by using a FEP tower to replace the carbon steel one.Gas inlet tube was constructed of FEP with internal lead-evading player and acid-resistant brick liner and had an expansion joint.After transformation,the gas cooling tower ran well and cooling efficiency was significantly improved without any corrosion and leakage.
作者 刘毅
出处 《硫酸工业》 CAS 2013年第2期29-31,共3页 Sulphuric Acid Industry
关键词 硫酸生产 硫化氢 气体冷却塔 技术改造 膨胀节 sulphuric acid production hydrogen sulphide gas cooling tower technological transformation expansion joint
  • 相关文献

参考文献2

二级参考文献4

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部