期刊文献+

某考虑荷载不利布置的地铁结构设计 被引量:1

A Subway Structure Design Considering Adverse Load Arrangement
下载PDF
导出
摘要 以广州地铁十四号线镇龙北站为工程背景,在选取一榀典型框架的基础上,着重分析了主体结构在地面活荷载、侧向土压力、水压力等荷载在不同取值工况下的的弯矩、剪力的变化规律,并与按常规方法分析的结果进行对比,结果表明考虑上述因素后地铁结构的各构件相比于传统计算结果有不同程度的增加。 Taking Guangzhou Metro Line 14 Zhenlongbei station as engineering background,focuses on the analysis of the variation of the main structure in the ground live load,lateral soil pressure,water pressure load in different value under bending moment,shear force in selecting a typical framework,and with the results of the analysis carried out by a conventional method comparison. Considering the above factors,some members have different degrees of increase compared with the traditional calculation results.
出处 《广东土木与建筑》 2013年第10期50-52,共3页 Guangdong Architecture Civil Engineering
关键词 地铁 荷载不利布置 水土压力 subway adverse load arrangement soil and water pressure
  • 相关文献

参考文献1

  • 1GB 50157-2003.地铁设计规范[S]..2003

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部