期刊文献+

金沙江巨型梯级水电站群“调控一体化”技术保障系统的创新实践及发展思考 被引量:2

Implementation and Development of the Support Systems for the Integration of Dispatch and Control of the Large-scale Cascade Hydropower Station Group on the Jinsha River
原文传递
导出
摘要 本文主要介绍了金沙江巨型梯级水电站群"调控一体化"技术保障系统的建设、运行情况。重点关注了成都调控中心自动化系统体系的整体构成以及创新技术等。结合系统建设以及实际运行经验,总结与分析了保障系统的技术特点,建设性地提出了"调控一体化"技术保障系统建设需要注意的问题以及相应的解决方法。 This article mainly discusses the construction and operation of the support systems for the integration of dispatch and control of the large-scale cascade hydropower station group on the Jinsha River.The overall architecture and innovative technologies of the automatic systems in Chengdu Dispatch and Control Center are highlighted.Based on the experience on the systems' construction and operation,we summarize and analyze the technical characteristics of the systems,and constructively propose issues that need attention during the systems' construction and the corresponding solutions.
作者 谭华
出处 《水电自动化与大坝监测》 2014年第1期67-71,共5页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 梯级水电站 调控一体化 技术保障 安全可靠 cascade hydropower plants integration of dispatch and control technical support security and reliability
  • 相关文献

同被引文献21

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部