期刊文献+

海洋石油深水钻井作业风险分析 被引量:3

原文传递
导出
摘要 海洋石油深水钻井既有常规浅水区作业的所有风险,又有水深增加的风险,由于深水钻井平台本身设备的复杂性,自动化程度增加,平台本身存在人员操作不熟练,关键设施动力定位失效的风险。海底低温及高压导致的对钻井液的影响,天然气水合物的形成,地质状况的特殊性等导致钻井作业的影响。水下防喷器的可靠性、钻井设计、后勤保障、人员培训及关键作业程序的执行是预防各类风险失控的关键。
作者 王均 刘伟安
出处 《中国石油和化工标准与质量》 2012年第12期156-157,共2页 China Petroleum and Chemical Standard and Quality
  • 相关文献

参考文献4

二级参考文献6

  • 1Shaughnessy J M, Armagost W K,etc. Problems of ultra-deepwater drilling[C]. Society of Petroleum Engineers, 1999.
  • 2Brekke J N. Key Elements in Ultra-Deep Water Drilling Riser Management[C]. Society of Petroleum Engineers, 2001.
  • 3Haibo Chen, Torgeir Moan, Harry Verhoeven. Safety of dynamic positioning operations on mobile offshore drilling units [J]. Reliability Engineering ~ System Safety, 2008, 93(7) : 1072-1090.
  • 4Shaughnessy J, Daugherty W, Grail R,etc. More Ultra-deepwater Drilling Problems[C]. Society of Petroleum Engi- neers, 2007.
  • 5Chen H, Moan T, Verhoeven H. Effect of DGPS failures on dynamic positioning of mobile drilling units in the North Sea [J]. Accident Analysis and Prevention, 2009, 41(6) : 1164-1171.
  • 6SPE 38567 Hydrate Control during Deep Water Drilling Overview and New Drilling Fluids Formulations Hege Ebeltoft, SPE, STATOIL and M. Yousif,SPE, llTR1Westport Technology Center and Eirik Soergaard, SPE, Norsk Hydro ASA.

共引文献9

同被引文献48

  • 1关昌伦,叶学礼.天然气水合物抑制剂甲醇注入量的计算[J].天然气与石油,1993,11(4):8-29. 被引量:14
  • 2许维秀,李其京,陈光进.天然气水合物抑制剂研究进展[J].化工进展,2006,25(11):1289-1293. 被引量:48
  • 3张启根,陈馥,刘彝,熊颖.国外高性能水基钻井液技术发展现状[J].钻井液与完井液,2007,24(3):74-77. 被引量:98
  • 4陈光进,孙长宇,马庆兰.气体水合物科学与技术[M].北京:化学工业出版社,2007.
  • 5Watson P A, lyoho A W, Meize R A, et al. Management issues and technical experience in deepwater and ultra-deepwater drilling[R]. OTC 17119, 2005.
  • 6Triolo D, Mosness T, Habib R K. The Liwan gas project: A case study of South China Sea deepwater drilling campaign[R]. IPTC 16722, 2013.
  • 7Zhang Liang, Huang Anyuan, Wang Wei, et al. Hydrate risks and prevention solutions for a high pressure gasfield offshore in South China Sea[J]. International Journal of Oil, Gas and Coal Technology, 2013, 6(6): 613-623.
  • 8Davalath J, Barker J W. Hydrate inhibition design for deepwater completions[J]. SPE Drilling & Completion, 1995, 10(2): 115-121.
  • 9Pakulski M, Qu Q, Pearcy R. Gulf of Mexico deepwater well completion with hydrate inhibitors[R]. SPE 92971, 2005.
  • 10Vickers S, Hutton A, Lund A, et al. Designing well fluids for the Ormen Lange gas project, right on the edge[R]. SPE 112292, 2008.

引证文献3

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部