2ARMENTA M M,WOJTANOWICZ A K. Incremental Recovery Using Dual-Completed Wells in Gas Reservoirs With Bottom Water Drive:A Feasibility Study[J].Journal of Canadian Petroleum Technology,2005,(06).
3GREBENKIN I M,DAVIES D R. A Novel Optimisation Algorithm for Inflow Control Valve Management[A].Copenhagen,Denmark,Society of Petroleum Engineers,2012.