摘要 卵石层是常规定向钻穿越施工的禁区,采用常规工艺扩孔时,因泥浆不能够支撑卵石而形成管线回拖所必需的环形空间,基本无法施工。本文以长庆-乌海-临河输气管道工程黄河定向钻穿越为例,介绍了采取安装套管的方法穿越卵石层,保证钻导向孔、扩孔和回拖的施工技术。 Pebble bed is a restricted area in the cross construction of general orientation drilling. When the normal expanding-hole craft was adopted, the pipeline can not be pull-back because the mud can not prop up the pebble bed. For the Yellow River section between Changqing to Wuhai to Linhe gas pipeline as an example, this paper introduces a method of crossing pebble bed which can ensure the success rates of guiding- hole, expanding-hole and pull-back construction by fixing a sleeve.
出处 《中国化工装备》 CAS 2011年第3期26-29,共4页 China Chemical Industry Equipment
关键词 长输管道 穿越 卵石 砂层 套管 long-distance pipeline, cross, pebble, sand bed, sleeve