期刊文献+

过江隧道盾构施工技术研究 被引量:2

Study on Shield construction technology of River-crossing Tunnel
下载PDF
导出
摘要 文章以广州轨道交通某盾构法施工的过江隧道为研究对象,对水下隧道盾构长距离穿越砂层、承受高水压,在复杂地质条件和地下水状况下的施工技术进行了探讨。为了确保盾构过江安全,本文从隧道上浮问题和管片变形,水土压力设定与控制,泥浆特性等问题进行初步的研究分析。 Based on a ri ver-crossing tunnel by shield method of Guangzhou metro tunnel project,this paper studied the issues of the construction technology of river-crossing tunnel which is long-distance through sand layer,under high water pressure、complicated geological condition and ground water.In order to insure the safety of river-crossing tunnel,an indepth study is made on the problems of tunnel floating and segmental transfiguration,the method of enactment and control on water-soil pressure,the characteristic of soft mud.
作者 蓝柳和
出处 《建筑监督检测与造价》 2009年第5期31-34,共4页 Supervision Test and Cost of Construction
关键词 施工 过江隧道 盾构施工 管片上浮 construction river-crossing tunnel shield construction segmental flaoting
  • 相关文献

同被引文献6

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部