本文介绍佛山市中医院医疗综合大楼施工中采用干挂法工艺替代了传统的湿贴法,对关键控制点严格管理和控制,使墙面石材损坏率很低,达到了设计预期的质量要求和装饰效果。
In Foshan traditional-Chinese-medicine hospital project,the Dry method was adopted to replace the conventional Wet method on the the decorative stone wall construction.Through the strict management and control on the critical control points,this new technique reduced the failure rate,achieved the desired design quality requirements and reached good results.