5Yunjie Wei1, Mo Xu2, Wenpei Wang1, Anchi Shi3, Mingfa Tang3, Zhiping Ye3 1 Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing, 100124, China 2 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu, 610059, China 3 East China Investigation and Design Institute, China Hydropower Engineering Consulting Group Corporation, Hangzhou, 310014, China.Feasibility of columnar jointed basalt used for high-arch dam foundation[J].Journal of Rock Mechanics and Geotechnical Engineering,2011,3(S1):461-468. 被引量:2
7Hawkins, A B. Rock descriptions site investigation practice :assessing BS5930 [ J]. Geological Society,Engineering GeologySpecial Pub, 1986.
8Bilgin N, Seyrek T. Golden horn clean up contributes valuabledata [J]. Tunnels and Tunneling, 1988,(6) : 41 ~44.
9Paul Quigley and Steven McSwinney. Measurement and analysisof rock mass fractures and their applications in civil engineering[J ]. The Institute of Engineers of Ireland,GeotechnicalSociety, 1996.
10Hawkins,A B.Rock descriptions site investigation practice:assessing BS5930. . 1986