摘要
China is undertaking an increasing number of mega-infrastructure projects along with its rapid economic expansion.For participants in these projects,understand how to adapt the proper and efficient management strategies is critical.In this paper,we propose three distinct models for companies under various background and management requirements,based on sophisticated data analysis and model development.Moreover,we successfully committed these models with hydropower development projects and achieved a great progress in enhancing management efficiency.
China is undertaking an increasing number of mega-infrastructure projects along with its rapid economic expansion.For participants in these projects,understand how to adapt the proper and efficient management strategies is critical.In this paper,we propose three distinct models for companies under various background and management requirements,based on sophisticated data analysis and model development.Moreover,we successfully committed these models with hydropower development projects and achieved a great progress in enhancing management efficiency.
作者
LIN ZhengHang 1,2,QIANG MaoShan 1,2,TANG WenZhe 1,2,FAN QiXiang 3 &LIU Qiang 4 1 Institute of Project Management and Construction Technology,Tsinghua University,Beijing 100084,China
2 State Key Laboratory of Hydraulic and Engineering,Tsinghua University,Beijing 100084,China
3 China Three Gorges Corporation,Yichang 443002,China
4 School of Software,Tsinghua University,Beijing 100084,China
基金
supported by the National Natural Science Foundation of China(Grant Nos.50539130,51079070,70761058,and 51179086)
the Ph.D.Programs Foundation of Ministry of China(Grant No. 20091011294)
the Foundation of State Key Laboratory of Hydraulic and Engineering(Grant No.2009ZY7)