摘要 近年来,随着环境保育观念的提升,减少地表开挖的理念,已逐渐落实在隧道设计及施工实务上。以往,隧道洞口浅覆段采用明挖法,已逐渐被暗挖法直接穿越所取代。即使在地质、地形或环境条件上不尽理想之区段,基于整体路线考量,亦有非采用不可之情形。本文以台湾北部正施工中的双线双车道公路隧道为例,探讨ADECO-RS工法在隧道洞口浅覆进洞的应用与对策。由于该案例位处山凹处,属谷部地形,不仅覆盖极薄,开挖过程中更遭遇到废煤矿碴与多雨的气候,使得降雨所汇集的地表水,不断入渗至隧道内,开挖面自立性极差。几乎非原设计之NATM工法足以因应。但经采取ADECO-RS工法之管幂加劲、土心加固及拱盖培厚等超前约束与加固理念后,勉为通过,其处理经验与心得,希供后续类似案例之参考。 近年来,随着环境保育观念的提升,减少地表开挖的理念,已逐渐落实在隧道设计及施工实务上。以往,隧道洞口浅覆段采用明挖法,已逐渐被暗挖法直接穿越所取代。即使在地质、地形或环境条件上不尽理想之区段,基于整体路线考量,亦有非采用不可之情形。本文以台湾北部正施工中的双线双车道公路隧道为例,探讨ADECO-RS工法在隧道洞口浅覆进洞的应用与对策。由于该案例位处山凹处,属谷部地形,不仅覆盖极薄,开挖过程中更遭遇到废煤矿碴与多雨的气候,使得降雨所汇集的地表水,不断入渗至隧道内,开挖面自立性极差。几乎非原设计之NATM工法足以因应。但经采取ADECO-RS工法之管幂加劲、土心加固及拱盖培厚等超前约束与加固理念后,勉为通过,其处理经验与心得,希供后续类似案例之参考。
出处 《隧道建设》 2011年第S1期346-353,共8页 Tunnel Construction
关键词 新意法 浅覆隧道 管幂工法 新奥法 ADECO-RS method tunnel with shallow overburden pipe-roofing method NATM
  • 相关文献

参考文献3

二级参考文献11

  • 1高新强,仇文革,关宝树.新建铁路隧道动态设计系统的构思[J].铁道标准设计,2004,24(8):44-47. 被引量:9
  • 2肖广智,魏祥龙.意大利岩土控制变形(ADECO-RS)工法简介[J].现代隧道技术,2007,44(3):11-15. 被引量:31
  • 3[2]Pietro Lunardi.The design and construction of tunnels using the approaeh based on the analysis of controlled deformation in rocks and soils[J].Tunnels & Tuunding International ADECO-RS Approach,2000(5):3-30.
  • 4[3]P.Lunardi,R.Bindi.The evolution of reinforcement of the advance core using fibre glass elements for short and long term stability of tunnels under difficult sliess-straiu conditions:design,technologies and operating methods[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Volume Ⅱ.Bologna:PATRON EDITORE,2001:309-322.
  • 5[4]P.Lunardi.The ADECO-RS Approach in the design and construction of the Rome to Naples high speed railway line:a comparison between final design specifications,conshruction design and"as-built"[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Vdume Ⅲ.Bologna:PATRON EDITORE,2001:329-340.
  • 6[5]P.Lunardi,C.Silva,A.Focracci.The Bologna to Florence high speed railway line:92km through the Appennines[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th June 2001.Volume Ⅲ.Bologna:PArIRON EDITORE,2001:341-351.
  • 7[6]P.Gattinoni,M.Papini,L.Seesi.Geologic risk in underground works[C]//Progress in Tunnelling after 2000:Proceedings of the AITES-ITA 2001 World Tunnel Congress Milan-Italy 10th-13th 2001.Volume Ⅰ.Bologna:PATRON EDITORE,2001:309-318.
  • 8意大利特莱维集团.意大利ADECO—RS施工法[C].中国高速铁路隧道国际学术研讨会论文集,2006—10.
  • 9Frederic L. Pellet,Time dependent Behaviour of Rocks related to Underground Construction [ R ], ISRM Lecture Tour in China, October 2006.
  • 10Pietro Lunardi. The design and construction of tunnels using the approach base on the analysis of controlled deformation in rocks and soils, Roeksoil S. p. A Piazza San Marco, May 2000.