摘要
An exclusive interview with the author was published in Issue 2, 2010 of this journal, in which the starting point and macro-strategy to construct smart grid in China was presented. Meanwhile, the three periods of smart grid construction were also mentioned, namely planning and pilot project construction period, overall construction period, and improvement and upgrade period as it is planned by SGCC. At the invitation of this journal, the author wrote another article to further elaborate the implementation in the f irst period of SGCC smart grid program. The article will be published in two consecutive issues. The f irst part of the article was published in Issue 3, 2010. This is the second part of the article.
An exclusive interview with the author was published in Issue 2, 2010 of this journal, in which the starting point and macro-strategy to construct smart grid in China was presented. Meanwhile, the three periods of smart grid construction were also mentioned, namely planning and pilot project construction period, overall construction period, and improvement and upgrade period as it is planned by SGCC. At the invitation of this journal, the author wrote another article to further elaborate the implementation in the f irst period of SGCC smart grid program. The article will be published in two consecutive issues. The f irst part of the article was published in Issue 3, 2010. This is the second part of the article.