期刊文献+

Layout of China’s Nuclear Power Plants

Layout of China’s Nuclear Power Plants
原文传递
导出
摘要 Plants in operation Qinshan Nuclear Power Plant-total installed capacity of 2.956 gigawatts The first stage started construction in March 1985, was incorporated into grids in December 1991 and began business operation in April 1994. It has an installed capacity of
出处 《Beijing Review》 2009年第29期29-29,共1页 北京周报(英文版)

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部