摘要
从跨步电压说起,分析了地铁站台屏蔽门系统接地和绝缘的原因,给出了接地和绝缘方案,同时,提供了施工检测标准。
From talking about the step voltage,the causation of the the grounding and isolation is analyzing in the platform screen door,and the scheme of the grounding and isolation is presented.Meanwhile,the implementing criterion is provided.
出处
《电气技术》
2010年第10期53-55,共3页
Electrical Engineering
关键词
屏蔽门
接地
绝缘
跨步电压
platform screen door
grounding
isolation
step voltage