摘要针对目前桥式起重机传动控制过程中出现缺点,本文提出用PLC、变频器进行电气控制改造。For improving the defects of the bridge Crane's drive control in nowadays,this article provides the improvement methods by using PLC and Converter。
5Legaev V P , Generalov L K. Openoptimization in two - dimensionallathecontrol systems [ J ] . Russian Engineering Research, 2010, 30(1): 38-40.
6Renton D , Elbestawi M A . Highspeedservocontrolofmuhi - axismachinetools [ J ] . International Journal of Machine Toolsand Manufacture, 2002, 40(4): 539-559.