变电站中央事故和预告信号的PLC控制 被引量:1

PLC Control of the Central Incident and Warning Signal of Substation
下载PDF
导出
摘要 目前,大多数电气配电所的中央预告和事故信号仍然使用继电接触控制系统,其缺点是接线多且复杂,体积大,动作速度慢,修理困难,容易发生误动作。针对于这种情况,笔者采用西门子S7-200PLC设计了控制变电站中央事故和预告信号系统,包括事故音响信号、预告信号、灯光信号等的I/O分配表及中央事故和预告信号系统梯形图控制程序。经过模拟运行,完全能够实现对系统控制的要求。 At present the central signal system of the majority of our substations and distributions is still using the traditional relay contactor control system, whose disadvantages are multiple and complex wiring, bulky, slow movements, difficult to repair, prone to malfunction. For this situation, this paper uses the PLC of Siemens S7-200 and designs the central signaling system to control the substation, which includes the I/O allocation tables of the incident sound signals, warning signals, light signals and the ladder diagram control programs of the central signal system. Through the simulation, it is able to fulfill the requirements of the system control.
出处 《电气技术》 2010年第4期88-91,共4页 Electrical Engineering
基金 黑龙江省重点科技项目计划(GZ08A504)
关键词 西门子S7-200 变电站 中央事故和预告信号系统 Siemens S7-200 substation central signal system
  • 相关文献

参考文献4

二级参考文献4

  • 1王兆义.可编程控制器教程[M].北京:机械工业出版社,1997.45-78.
  • 2电力工业部西北电力设计院.电力工程电气设计手册(电气二次部分)(2)[M].中国水利电力出版社,1989..
  • 3邓则名 邝穗芳.电器与可编程控制器应用技术[M].北京:机械工业出版社,2001..
  • 4范锡善.发电厂电气部分[M].北京:水力电力出版社,1987..

共引文献6

同被引文献18

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部