期刊文献+

非理想状态下产品的生产策略

Production strategy of non-ideal state of production process
下载PDF
导出
摘要 针对单一设备,重复生产多种产品,考虑生产过程为非理想状态时,对产品最佳生产周期与检测策略的问题进行了分析,设计不同于叠代法的搜寻方法。在设计过程中考虑生产成本和存货成本,同时,为减少生产过程中不合格产品的数量,设定在每个周期内,实施检测的次数,使得包含不合格品检测成本和不合格品所衍生的机会成本后,所得的平均总成本达到最小,仿真结果证明该了方法的有效性。 For a single device producing a variety of products under a non-ideal state of production process, the optimal production cycle and detection strategies were analyzed and a search method different than the iterative approach was designed. The production costs and inventory costs were considered during the design process. In order to reduce the number of defective products, the detention frequency in each cycle was prespecified so that the average total cost can be minimized after adjustments of the detection costs for defective products and the associated opportunity costs. The results of simulation prove that the method is effective.
作者 陈琦 马向阳
出处 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2009年第S1期295-298,共4页 Journal of Central South University:Science and Technology
基金 天津商业大学科研基金资助项目(070114)
关键词 生产周期 检测策略 搜寻方法 production cycle detection strategy search method
  • 相关文献

参考文献1

二级参考文献13

  • 1郑锋,孙树栋,吴秀丽.基于遗传算法和模型仿真的调度规则决策方法[J].计算机集成制造系统,2004,10(7):808-814. 被引量:7
  • 2Suresh Chand,Tim McClurg,Jim Ward.A model for paralell machine replacement with capacity expansion[J].European Journal of Operational Research,2000,121:519-531.
  • 3Stylianides T.A model of clinker capacity[J].European Journal of Operational Research,1998,110:215-222.
  • 4Lee L H,Tan K C,Ou K,et al.Vehicle capacity planning system:A case study on vehicle routing problem with time windows[J].IEEE Transactions on Systems,Man,and Cybernetics-part A:Systems and Humans,2003,33(2):169-178.
  • 5Catay B,Erenguc S S,Vakharia A J.Tool capacity planning in semiconductor manufacturing[J].Computers & Operations Research,2003,30:1349-1366.
  • 6Hood S J,Bermon S,Barahona F.Capacity planning under demand uncertainty for semiconductor manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,2003,16(2):273-280.
  • 7Grubbstrom R W,Wang Z.A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems[J].International Journal of Production Economics,2003,81-82:483-494.
  • 8Iida T.A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand[J].European Journal of Operational Research,2002,140:670-683.
  • 9Wang Reaychen,Liang Tienfu.Application of fuzzy multi-objective linear programming to aggregate production planning[J].Computers & Industrial Engineering,2004,46:17-41.
  • 10Zijm W H M,Buitenhek R.Capacity planning and lead time management[J].International Journal of Production Economics,1996,46-47:165-179.

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部