摘要
介绍了850kW风力发电机设备安装工艺流程以及吊装机械的选择方法。对塔筒、机舱、叶轮等主要设备的安装顺序、方法、要点及其注意事项,均进行了详细叙述。
This article consists of the installation process of 850kW wind turbine generator and the selection method of lifting machinery.Especially for the installation order,methods,main points and attentions of towers tube,engine room,impeller and other major equipments,it describs in detail.
出处
《冶金设备》
2009年第S1期124-126,共3页
Metallurgical Equipment
关键词
风力
发电机
安装
Wind Turbine generator Installation