阳江核电厂土石方一期工程设计经验总结 被引量:1

Experience summary of phase Ⅰ of earth and rock work for Yangjiang Nuclear Power Plant
原文传递
导出
摘要 阳江核电站一期土石方工程与以往的土石方工程不同,工程实施动态工程量统计,由设计院根据现场需求,开展动态平衡设计,现场动态跟踪和调整土石方施工进度.考虑到后续的核电项目(如台山核电、陆丰核电、岭澳6+2等)前期施工中也会遇到与其相似的要求,通过对阳江核电站一期土石方工程中一些突出问题的归纳和小结,为其他项目的土石方工程设计提供借鉴. Phase Ⅰ of earth and rock work of Yangjiang Nuclear Power Plant is different from that of previous times.This project made statistics on dynamic project quantity.Design institute carried out dynamically balanced design,on-the-spot dynamic tracking and adjustment of earth and rock construction schedule based on site actual demand.Considering similar requirements may be demanded in prophase construction of follow-up nuclear power projects(such as Taishan Nnclear Power Project,Lufeng Nnclear Power Project and Linao 6+2 Project,etc.),through summarizing key points of earth and rock work(phase Ⅰ) in Yangjiang Nuclear Power Project,the reference is provided for other earth and rock works.
作者 雷达
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2009年第S1期113-116,共4页 Engineering Journal of Wuhan University
关键词 核电站 土石方工程 设计问题 经验总结 nuclear power plant earth and rock work design problems experience summary
  • 相关文献

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部