期刊文献+

百色水库汛期划分及分期设计洪水的计算 被引量:1

Flood Season Division and Stage Design Flood Calculation for Baise Reservoir
下载PDF
导出
摘要 通过详细分析右江流域汛期洪水发生成因及发生时间的规律,结合百色水库优化调度的要求,对百色水库汛期进行划分。根据流域的防汛情况和水库蓄水要求,结合后汛期洪水逐渐过渡的特征,从后汛期蓄水时间提前的可能考虑.提出按旬划分的分期方法.分别计算各分期的设计洪水。 The flood season of Baise Reservoir was divided by analyzing the causes and law of occurance time of floods in Youjiang Basin and demand of optimal dispatching of Baise Reservoir.According to the flood control standard of the basin,the demand of impoundment of the reservoir,and the characteristics of gradual transition of floods in post flood season,a method of dividing the flood season by ten-day was put forward considering the possibility of impoundment being ahead of schedule in post flood season,on the basis of which design flood can be calculated respectively of each ten-day.
出处 《水文》 CSCD 北大核心 2009年第S1期79-81,58,共4页 Journal of China Hydrology
关键词 洪水成因分析 洪水特征分析 汛期划分 分期设计洪水 flood cause analyzing flood characteristics analyzing flood season division seasonal design flood
  • 相关文献

参考文献2

共引文献6

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部