摘要
介绍了编制核电厂设计进度的思路与流程,包括计划编制的各个重点环节,并在设计进度、文件、接口管理方面进行了改进,从理论角度实现了"进度、接口、图文"管理一体化的设计管理创新。
The ideas and flow of plan establishment during the nuclear power station design is discussed in this paper, including the main steps in the plan establishment, and the design schedule and the management of documents and interfaces are improved. An integral design management innovation is proposed for the management of 'schedule, interfaces and drawings and files'.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2009年第S2期84-87,共4页
Nuclear Power Engineering
关键词
设计进度管理
WBS
计划编制
Design schedule management, Work Breakdown Structure, Plan Establishment