摘要
The improved weighted-least-square model was used for state simulation of water distribution networks. And DFP algorithm was applied to get the model solution. In order to fit DFP algorithm,the initial model was transformed into a non-constrained optimization problem using mass conservation. Then,through one dimensional optimization and scale matrix establishment,the feasible direction of iteration was obtained,and the values of state variables could be calculated. After several iterations,the optimal estimates of state variables were worked out and state simulation of water distribution networks was achieved as a result. A program of DFP algorithm is developed with Delphi 7 for verification. By running on a designed network,which is composed of 55 nodes,94 pipes and 40 loops,it is proved that DFP algorithm can quickly get the convergence. After 36 iterations,the root mean square of all nodal head errors is reduced by 90.84% from 5.57 to 0.51 m,and the maximum error is only 1.30 m. Compared to Marquardt algorithm,the procedure of DFP algorithm is more stable,and the initial values have less influences on calculation accuracy. Therefore,DFP algorithm can be used for real-time simulation of water distribution networks.
The improved weighted-least-square model was used for state simulation of water distribution networks. And DFP algorithm was applied to get the model solution. In order to fit DFP algorithm,the initial model was transformed into a non-constrained optimization problem using mass conservation. Then,through one dimensional optimization and scale matrix establishment,the feasible direction of iteration was obtained,and the values of state variables could be calculated. After several iterations,the optimal estimates of state variables were worked out and state simulation of water distribution networks was achieved as a result. A program of DFP algorithm is developed with Delphi 7 for verification. By running on a designed network,which is composed of 55 nodes,94 pipes and 40 loops,it is proved that DFP algorithm can quickly get the convergence. After 36 iterations,the root mean square of all nodal head errors is reduced by 90.84% from 5.57 to 0.51 m,and the maximum error is only 1.30 m. Compared to Marquardt algorithm,the procedure of DFP algorithm is more stable,and the initial values have less influences on calculation accuracy. Therefore,DFP algorithm can be used for real-time simulation of water distribution networks.
基金
Project(IRT0853) supported by Changjiang Scholars and Innovative Research Team in University
Project(DB03086) supported by Talents Fund of Xi’an University of Architecture and Technology
Project(50978213) supported by National Natural Science Foundation