以淮河入海水道近期工程滨海新闸工程灌注桩施工为例,介绍沿海地区复杂土层钻孔灌注桩施工工序、质量控制要点及影响工序质量因素的控制,从而保证灌注桩施工的工序过程处于严格、有效的质量控制中。
Take the recent works of Huaihe River water entry channel called Binhai New Gate Project bored pile construction as example,the complex soil bored pile construction procedure,main point of quality control and the control of factors affect procedure quality in coastal area are introdued,thereby the strict procedures of piles construction is ensured under the effective quality control.