摘要
北京市昌平区综合体育馆钢屋盖采用主次空间钢桁架组合结构体系。详细介绍钢构件制作加工、钢结构安装的施工技术和注意事项。并阐述施工过程中所进行的预测、控制、检测和结构调整措施,有效保证了施工质量。
Space primary-secondary steel truss structure is adopted in large-span roof of Beijing Changping Integrated Gymnasium.The construction technology and attention points about fabrication of steel members,installation of steel structure are introduced.Besides,measures of precast,control,test and adjustment are outlined during the process of construction.Thus,construction quality is ensured.
出处
《施工技术》
CAS
北大核心
2009年第S2期118-120,共3页
Construction Technology
关键词
大跨度
体育馆
施工技术
large span
gymnasium
construction technology