摘要
在预应力钢绞线施工中,控制张拉力一般均为设计给定的数值,介绍了其确定方法;由于施工因素、材料性能及环境条件的影响,预应力筋的预应力损失是不可避免的,给出了钢绞线与管道摩擦引起的损失的计算方法。
In construction of prestressed steel strand,the controlled tension force always be given by designers.The prestress loss is inevitable due to influence of construction factors,material capability and enviromental conditions.The author introduces determination of steel strand controlled tension force and calculation of prestress loss.
出处
《施工技术》
CAS
北大核心
2009年第S2期388-389,共2页
Construction Technology
关键词
钢绞线
控制张拉力
预应力损失
计算
steel strand
controlled tension force
prestress loss
calculation