摘要
基于蓬莱古船博物馆工程,采取泥浆护壁钻孔灌注桩和复合土钉墙等措施,在对关键工序进行深入研究和论证后指导施工。同步监测显示,施工期间没有对古城墙造成不良影响。
Taking the ancient boat museum in Penglai for example,technology measures are adopted including mud protection bored pile and composite soil nailing wall.It can guide construction after researching key procedures.The simultaneous monitoring shows that there are no effect on ancient city wall.
出处
《施工技术》
CAS
北大核心
2009年第S1期180-182,共3页
Construction Technology
关键词
深基坑
支护
施工技术
deep foundation excavation
support
construction technology