摘要
通过对大运二级公路介休至霍州段现状调查,对本段二级公路改造为一级公路的路线、路基、路面、桥涵、隧道等改建设计进行阐述,提出了一些改扩建项目的具体措施。
By investigation on present situation of Jiexiu to Huozhou part in Datong-Yuncheng Grade II Road,the part is rebuilt as grade I. Design on road basement,pavement,bridge and culvert and tunnel,and some practice measures are put forward on this rebuilt project.
出处
《施工技术》
CAS
北大核心
2009年第S1期267-269,共3页
Construction Technology
关键词
公路
现状
改扩建
整体设计
road
present situation
rebuilt
whole design