X70钢管道冬季焊接和防腐的技术措施 被引量:1

Technical Measures for Winter Construction of X70 Steel Pipes
下载PDF
导出
摘要 在兰银管道工程建设中,通过认真研究和大量的实践,总结出了一套有效的X70钢管道冬季焊接和防腐的技术措施,包括焊前预热、焊接中防风保温、焊后和返修保温缓冷、补口作业的除湿和保温等,给今后管道工程高强钢管的冬季焊接和防腐施工提供了借鉴。 Through deepening research and large amounts of practical work,a set of technical measures of welding and anticorrosion for winter construction of Lan-Yin Pipeline are summarized including preheating before welding,wind-proof and heat preservation during welding,heat preservation and cooling delay after welding and during repair,dehumidifying and thermal insulation for field joint.This experience provides a reference for future winter welding and anticorrosion constructions of X70 high strength steel pipes.
出处 《石油工程建设》 2009年第S2期110-112,1,共4页 Petroleum Engineering Construction
关键词 X70钢 焊接 保温 防腐 冬季施工 X70 steel welding thermal insulation anticorrosion winter construction