4Hua Zhao,Yi-lin Yin, A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: A theoretical model [C]. Industrial Engineering and Engineering Management (IE&EM) , 2011 : 1816-1820.
5麦强胜.项目风险管理若干问题的探讨[D].广州:暨南大学,2004.
6Posner R,Rosenfield A. Impossibility and Related Doctrines in Contract Law: An Economic Analysis [J]. Journal of Legal Studys,1997(6) :83-118.
7ANDI. The Importance and Allocation of Risks in Indonesian Construction Projects[J]. Construction Management and Economics, 2006 (24) : 69-80.