包钢炼铁厂一烧车间主厂房是利用20世纪旧厂房延长改造而成的,工艺要求将烧结机平台延长8.3 m,环冷机吊车轨面由18.00 m升高到27.50 m,吊车跨度及起重量不变。对此根据工艺所提资料对旧厂房进行了加固验算,进行了局部延长升高旧厂房的设计,使新老工艺融为一体,完全满足使用要求。
The main workshop building of No.1 sintering workshop in Iron-making Plant is rebuilt with old workshop building built in 20th century by extending.The requirements are platform for sintering machine has to be extended 8.3 m, rail surface of crane for ring cooling machine has to be risen from 18.00 m to 27.50 m,as well as span and elevating capacity have to stay the same.According to the information,the old workshop building is with checking calculation of hardness, extended partly and raised,which make new and old technique blend into a unity to satisfy requirements.
出处
《包钢科技》
2009年第S2期89-91,共3页
Science & Technology of Baotou Steel
关键词
厂房改造
钢排架
节点设计
rebuild workshop building
steel bent
node design