摘要
南京地铁一号线南延线花神庙站~南京南站区间隧道部分区段位于软~流塑地层中,隧道上方有建筑物,施工采用了超前大管棚、超前径向注浆小导管、掌子面注浆等强支护措施,采用监控量测的信息化技术,确保了隧道及地面建筑物的安全。
The tunnel between the Huashenmiao station and Nanjing south station of Nanjing No.1 subway line is located in soft fluidity plastic ground.There are some buildings on the top of the tunnel.It is using large-scale piperoof the small ahead-grouting pipe and tunnel face grouting technology to make strong protection,and using Monitoring and Measurement technology to make sure the tunnel and structures safe.
出处
《江苏建筑》
2009年第S1期30-32,共3页
Jiangsu Construction
关键词
浅埋暗挖法
地铁隧道
软~流塑
大管棚
超前径向注浆小导管
掌子面
mining excavation for shallow tunnels
metro tunnel
soft fluidity plastic ground
large-scale piperoof
small ahead-grouting pipe