摘要
高炉重力除尘系统中,随着煤气下降管的跨度增加,温度推力对整个结构的影响越来越大。以实际工程为例,简要介绍了煤气下降管的分析设计过程。
In the gravity dust-removal system of blast furnace,as the span of gas downcomer becomes wider and wider the wind load temperature thrust has a more and more influence on overall structure.Using an actual project,it is given a brief introduction to the analysis and design process of a gas downcomer.
出处
《工业建筑》
CSCD
北大核心
2009年第S1期624-626,共3页
Industrial Construction
关键词
高炉重力除尘
粗煤气
温度荷载
BF gravity dust-removal
raw gas
temperature load