期刊文献+

CFG桩施工造成环境岩土工程问题的研究

STUDY ON ENVIRONMENTAL GEOTECHNICAL ENGINEERING PROBLEM CAUSED BY CONSTRUCTION OF CFG PILE
原文传递
导出
摘要 长螺旋钻管内泵压CFG桩,是近10年来发展起来的一项复合地基新技术。然而当该技术应用到郑州地区的某些区域时却出现了环境岩土工程问题。根据多年的施工经验,对其进行了研究,得出长螺旋钻管内泵压CFG桩施工引起的环境岩土工程问题与施工工艺和施工场地的岩土工程条件有关。 Pressure Pumped CFG Pile by continuous auger drilling is a kind of composite foundation new technology,which has been raised and developed in recent 10 years. But when this technology is applied in some regions in Zhengzhou,there appear to be various environmental geotechnical engineering problems in the actual process of project construction.Based on author's working experieuce,the reason of which is studied,and it is drawed that environmental geotechnical engineering problem is related to the construction technology and geotechnical engineering condition in construction site.
出处 《工业建筑》 CSCD 北大核心 2009年第S1期1052-1054,1104,共4页 Industrial Construction
基金 河南省科技攻关项目"长螺旋钻管内泵压CFG桩复合地基技术在饱和粉土中的适应性研究" 项目编号0524450008
关键词 长螺旋钻管内泵压CFG桩 环境岩土工程问题 施工工艺 饱和粉土 pressure pumped CFG pile by continuous auger drilling environmental geotechnical engineering problem construction technology saturated silt
  • 相关文献

参考文献2

二级参考文献7

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部