简述了托克托电厂6kV厂用电量计费系统的原有状况,改造原因;详述了新系统各个设备的主要功能和改造方案。
This paper briefly describes the original situation of 6kV auxiliary power metering system in Tuoketuo Power Plant and the reasons for renovation.It also describes in detail the renovation scheme and main functions of each equipment of the new system.
出处
《华北电力技术》
CAS
2009年第S1期78-80,共3页
North China Electric Power
关键词
6kV厂用电量
计费系统
改造
设备
6kV auxiliary power
metering system
renovate
equipment.