蚌埠500kV禹会变电站光纤接续方法探索

Research on the Methods of Optical Fiber Splicing in 500KV Yuhui Substation in Bengbu
下载PDF
导出
摘要 随着电网建设的加速发展和电网保护系统信息化水平的提升,光纤通讯发展迅猛。近年来,大型枢纽变电站越来越多,其站内的光纤接续也越来越复杂,工期也越来越紧。如何在较短时间内,优质、高效地完成站内的光纤接续施工,需要在工程组织、技术改进方面不断摸索和改进。文中以蚌埠500 kV禹会变电站光缆接续工程为例,简述大型变电站内光纤接续工作中一些新问题及其对策。 With the development of electric network construction and improvement of network protection information system, the fiber communication had been developed rapidly.The fiber splicing is quite complicated and the time limit of the projects is short with more and more central substations constructed recently.It needs to improve project organization and technology that completing the construction project efficiently in short time.It is presented in this paper that the problems and countermeasure of the optical fiber splicing by analyzing the fiber splicing project of 500 kV Yuhui substation in Bengbu.
出处 《安徽电力》 2008年第4期61-64,共4页 Anhui Electric Power
关键词 500 KV变电站 光纤 接续 方法 问题 对策 500 kV substation optical fiber splicing methods problems countermeasure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部