摘要
结合具体工程介绍了强夯碎石桩处理饱和粉土地基的问题,为在复杂软弱场地进行地基处理方案选择或基础方案选择提供了有价值的参考依据。
A new method of ground treatment with heavily rammed stone pile for saturated silt soil ground has been achieved successfully by means of engineering practice, which offers reliable reference data for scheme choose of foundation design in complex soft sites.
出处
《商情》
2008年第5期146-146,共1页
关键词
强夯碎石桩
复合地基
饱和粉土地基
dynamic- ramming
composite ground
saturated silt soil