核电建造是核电站从选址、设计、建造、运行链条中的一个重要环节,建造期间的质量关系核安全,施工质量涉及核安全质量文化、施工技术可行性、质量保证与质量控制等多个环节。秦山核电二期扩建工程3号机组土建施工通过技术管理创新,实现了工期短、混凝土质量达到清水混凝土质量标准。
Construction is a crucial link in the course of design,site selection,construction and operation for a nuclear power plant.The quality during construction directly affects the nuclear safety.And the construction quality involves various aspects including quality culture,feasibility of construction technique,quality assurance,and quality control.Through technical management innovation,great achievements have been made in the civil construction of Unit 3 of Qinshan Ⅱ Extension Project.As a result,the construction period was shortened and the concrete quality reached the fair-faced concrete standard.