摘要 全掏挖施工是人工在地基中直接掏挖出基础形状,插入钢筋笼、灌入混凝土形成基础的一种施工方法。采用全掏挖可以充分利用原状土的强度,减少对地表植被的破坏。通过实地调查当地水窖、窑洞及附近线路基础的处理方法,结合数值分析,分析了晋东南-南阳-荆门1000kV特高压线路河南黄土地段采用全掏挖的适宜性。结果表明,在河南马兰黄土中采用全掏挖有一定的安全度,可以采用。 Bell pile with manual dig aperture is excavated by hand. After the pile has the shape of concrete foundation, the reinforcing cage is inserted and concrete is caste in place. Since the soil above the foundation has its original structure strength, Hand excavated foundation has the advantages over other kind of foundation, besides, it has little damage of the vegetation above the soil. After a thorough survey the numerical calculation, the feasibility of hand-excavated foundation of a 1000kV transmission line in loess is discussed. It is founded that this kind of foundation is suitable in the loess in He 'Nan province.
作者 贾宁
出处 《工程勘察》 CSCD 北大核心 2008年第S1期175-182,共8页 Geotechnical Investigation & Surveying
关键词 输电线路 特高压 杆塔基础 全掏挖 黄土 1000kV transmission line poles and towers foundations hand-excavation loess
  • 相关文献

参考文献2

  • 1Van Langen, H,Vermeer, P. A.Automatic Step Size Correction for Non-Associated Plasticity Problems[].International Journal for Numerical Methods in Engineering.
  • 2Koiter W T.General theorems for elastic-plastic solids[].Progress in Solid Mechanics.1960

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部