摘要
济钢采取加强设计方案审查、实行项目经理负责制、无标底招标等措施 ,对 2 0 0 0 0m3/h制氧机工程进行全过程投资控制 ,从而节省了工程投资 ,确保了项目工期及质量。同时提出了加强制度建设 。
Through taking up some measures included strict designing inspection, implementing responsibility system of project manager,and no floor bidding etc, Jigang has total process investment control on 20000m 3/h oxygenerator project. These measures can save of project investment, ensure the quality and time of the project.At the same time,some new methodes such as enhancing system construction and adopting project general contract are put forward to control investment effectively.
出处
《山东冶金》
CAS
2003年第S1期45-47,共3页
Shandong Metallurgy