摘要
某高层建筑基坑西侧紧邻一道河沟,水量较大,采取三重管高压摆喷帷幕止水[1~4],施工完成后通过监测,未发现渗漏、地下水位明显下降和周围建筑物沉降现象。
In light of the west of the foundation pit for a highrise building is a small river, and the water head is large, three tubulars high pressure chemical churning was adopted as waterproof curtain structure. When completed, the monitoring results indicate that there are no penetration and obviously falling of underwater level and settlement of neighboring buildings.
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2003年第S1期103-104,145,共3页
Rock and Soil Mechanics
关键词
止水帷幕
三重管高压摆喷
监测
waterproof curtain structure
three tubulars high pressure chemical churning
monitoring