摘要
介绍了金陵石化炼油厂200万t/y柴油加氢装置建设中,237t重的反应器和60m高钢烟囱的整体吊装关键技术和经验,对同类工程施工具有参考价值。
The key technology and experience about the entirety lifting of the reactor (237t weight) and the steel funnel (60m high) in the construction of the 200 ten thousand tons per year diesel oil hydrogenation unit in THE JLPEC REFINERY were introduced, it has refrence value for the other similar engineering.
出处
《中国化工装备》
CAS
2002年第4期34-38,共5页
China Chemical Industry Equipment
关键词
柴油加氢装置
反应器
钢烟囱
整体吊装
the diesel oil hydrogenation unit
reactor
steel funnel
the entirety lifting