摘要 乌江沙沱水电站右岸河间地块可溶岩分布广泛、断裂构造发育 ,并横切贯穿河间地块形成构造缺口 ,水库蓄水后存在向车家河邻谷渗漏的可能性。本文从研究河间地块基本地质条件入手 ,运用各种勘察手段 ,对河间地块地下水运移特征及岩溶发育演变史进行初步分析 ,明确了此河间地块可能渗漏的规模及渗漏途径 。 On the area between rivers on the right bank of Shatuo Hydropower Station's reservoir,karst distributes widely,fault structures have developed and pierced through the area to form structural defects.After the reservoir forming,there is possibility of leaking from it into neighbor valley of the Chejiahe River.Studying basic geologic conditions of the area,using various investigating methods,the engineers have analyzed the features of underground water flow of the area and the karst development history,have found out the possible scale and path of seepage.The results could be as base of next research work.
作者 郭维祥
出处 《贵州水力发电》 2000年第3期13-17,24,共6页 Guizhou Water Power
关键词 乌江沙沱水电站 河间地块 渗漏 水力比降 低水位槽谷带 Shatuo Hydropower Station area between rivers seepage hydraulic grade trough valley with low water level
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部