摘要
响水电站岔管属国内目前自行制作的巨型钢岔管 ,采用了近年研制的WDL系列 60 0MPa级高强钢制作。由于特定条件下岔管未作水压试验 ,本文着重从焊接残余应力问题和材料及焊接接头的可靠性两方面探讨影响岔管结构安全的因素 。
Steel fork pipe of Xiangshui Hydropower Station is large-size one made in China,it was made of 600Mpa steel,WDL series,produced in home.Hydraulic pressure test has not been conduced on the pipe.The paper studies factors influenced safety of fork pipe structure from two aspects:weld residual stress and the reliability of weld joints,specially the issue of annealing for eliminating stress of high strength steel.
出处
《贵州水力发电》
2000年第2期42-44,共3页
Guizhou Water Power
关键词
响水电站
钢岔管
残余应力
无损检测
水压试验
Xiangshui Hydropower Station
residual stress
detection without damage
hydraulic pressure test