期刊文献+

三峡工程动工来葛洲坝水库河床演变分析

Analysis on River Bed Evolution of Gezhouba Reservoir Since the Starting of Three Gorges Project
下载PDF
导出
摘要 根据葛洲坝水库固定断面资料,分析了三峡工程动工前葛洲坝水库河道演变情况和水库冲淤特性;重点分析了三峡工程动工6年来其河床演变情况。认为,三峡工程动工以来葛洲坝水库冲淤特性保持不变;三峡工程施工对河道的影响,主要集中在两坝之间.以一期工程施工期影响最大,大江截流以后情况好转;6年来,水库累计冲刷量为3616×104m3,主要集中在常年回水区河段,其中两坝间累计冲刷量为2321.1×104m3,1998年特大洪水是水库冲刷的主要原因。 Based on the fixed section information of Gezhouba reservoir, the paper analyses the feature ofevolution of the river bed and its scouring and silting before the starting of the Three Gorges Project and itfocuses on the evolution of the river bed since the starting of the Three Gorges Project for the last sixyears. The paper concludes that the feature of scouring and silting of Gezhouba reservoir remains unchanged;the influence of the project construction upon the river bed concentrates on the area between twodams, the first period of the construction had the greatest influence and then less after the river closure. Forthe last six years,the total amount of outwash is 3 616×104m3, concentrating on the river reach of permanent backwater,among which the total amount of outwash in the area between two dames is 2 321×104m3.98's flood is the major cause of the outwash of the reservoir.
出处 《长江工程职业技术学院学报》 CAS 1999年第2期18-24,共7页 Journal of Changjiang Institute of Technology
关键词 三峡工程 葛洲坝水库 泥沙冲淤 河床演变 Three Gorges Project Gezhouba reservoir scouring and sliting evolution of river bed
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部