摘要
以池州发电厂一期工程水上钻探实践为例, 说明在长江水域进行水域钻探的施工工艺。
Water area drilling in Chang Jiang River is getting more and more important in geotechnical engineering investigation.Through water area drilling in Chizhou Electric power plant First project,exploratory program of water area drilling in Chang Jiang River has been analysed in this paper.
出处
《电力勘测设计》
1999年第3期55-58,共4页
Electric Power Survey & Design
关键词
水域
钻探
施工工艺
water area
drilling
construction technology