介绍武钢三炼钢800m^3/45m倒锥壳水塔施工——人工挖孔桩、水柜施工及施工中应注意的事项。
This paper is about the constructions of artificial excavate piled foundation and water chamber and points for attention of the construction for 800 m3/45 m inverted conicall shell water tower construction at the third steelwords of wu -steel.
出处
《山西冶金》
CAS
1999年第3期46-47,56,共3页
Shanxi Metallurgy
关键词
倒锥水塔
水柜吊装
注意事项
人工挖孔桩
油路布置
同步
inverted conicall shell water tower,water chamber hoisting,points for attention, artifical excavate piled foundation,oil cake arrange,synchronism