本文阐述了大型24米跨预应力屋架翻身扶起,吊装就位及索具设计等施工过程。
This essay describes that 24m span prestressed concrete roof trusses are straightened up from their lying states, erected in position and the rigging desigh construction process ect.
出处
《辽东学院学报(自然科学版)》
CAS
1999年第3期55-57,共3页
Journal of Eastern Liaoning University:Natural Science Edition
关键词
吊装机械
索具
加固
翻身
起吊
就位
erecting equipment rigging reinforement for roof trusses with scaffording timber straightening - up erection