1133.5 MW Small Thermal Power Units to be Shut Down in Jiangsu
1133.5 MW Small Thermal Power Units to be Shut Down in Jiangsu
-
1Dr. Stampfl-Blaha Visited Jiangsu[J].China Standardization,2012,57(3):13-13.
-
2陈书贵.开拓进取 德行天下——记德国MR新工厂江苏开德电气设备制造有限公司正式投产[J].电力设备,2008,9(7):123-124.
-
3何玉芹.中国首家超声电机产学研基地落户连云港[J].振动.测试与诊断,2008,28(3):205-205.
-
4Xu Ruilin Office of Jiangsu Renewable Energy Development Project Yang Hexiu.Analysis and Prospects of Jiangsu Offshore Wind Power Resources[J].Electricity,2010,21(4):24-26.
-
5Tianwan Nuclear Power Plant starts operation[J].Electricity,2005,16(A04):5-5.
-
6吴雷.APS技术在数字化电厂中的应用探索[J].科技资讯,2014,12(32):4-4. 被引量:4
-
7Equipment installation of Tianwan Nuclear Power Plant was begun[J].Electricity,2002(1):55-55.
-
8Brief survey on China's power construction in 1990[J].Electricity,1991(2):50-50.
-
9Go Hand-in-Hand to Win-Win A strategic partnership agreement in wind power industry signed between FAW Foundry and Jiangsu Miracle Logistics[J].China Foundry,2009,6(2):175-176.
-
10孙立宁,安辉,江溯,蔡鹤皋.Application of Piezoelectric Manipulator in Fine Manipulation[J].Journal of Harbin Institute of Technology(New Series),1995,2(3):79-82.